Recent Projects

Tasbuilt Hire collaborated with the client to design and create the perfect solution for their Orford project site.

Site Hub SH241 A

The final solution was a 4 unit site set up that included:

  • 2 Site Offices
  • 1 Crib Room
  • 1 Male & Female Ablution Block
  • Under Cover Area

For the best solution, Tasbuilt Hire set it up in the most effective way and completed it with a under cover area.

Get in Touch
Site Hub SH241 E
Site Hub SH241 B
Site Hub SH241 C
Site Hub SH241 G
Site Hub SH241 H
Site Hub SH241 F
Site Hub SH241 D

The result? A super efficient site and operations!

Subscribe to our Tasbuilt Talker Newsletter